User Tools

Site Tools


fowler_bob_liz

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
fowler_bob_liz [2007/12/11 05:30]
96.234.10.189
fowler_bob_liz [2018/09/12 20:25] (current)
Line 91: Line 91:
 The bathroom vanity was pieced together with parts from the original and some wainscoating we had in the garage. It is temporary as we plan to make a new one as well as a new door for the bathroom closet as a winter project. The bathroom vanity was pieced together with parts from the original and some wainscoating we had in the garage. It is temporary as we plan to make a new one as well as a new door for the bathroom closet as a winter project.
  
-We were in a bit of a hurry to get the trailer campable as we wanted to tow it to Massachusetts for Thanksgiving. This time, we would stay in the trailer! We got her back in camping trim in just under siz weeks. There is still a lot to do, but the worst is behind us now. The exterior paint will wait until Spring, but the interior decorating is well underway.+We were in a bit of a hurry to get the trailer campable as we wanted to tow it to Massachusetts for Thanksgiving. This time, we would stay in the trailer! We got her back in camping trim in just under six weeks. There is still a lot to do, but the worst is behind us now. The exterior paint will wait until Spring, but the interior decorating is well underway.
  
 {{http://​farm3.static.flickr.com/​2316/​2042608632_ecc8958b1c.jpg}} ​ {{http://​farm3.static.flickr.com/​2270/​2041809219_bf701c330e.jpg}} {{http://​farm3.static.flickr.com/​2316/​2042608632_ecc8958b1c.jpg}} ​ {{http://​farm3.static.flickr.com/​2270/​2041809219_bf701c330e.jpg}}
fowler_bob_liz.txt ยท Last modified: 2018/09/12 20:25 (external edit)